Rogers

Bell Canada/Nexacor, Toronto, ON (2011):
(Project Completed with WSP Canada)

Provided design and construction services for various Bell Canada server sites and critical facilities. Designs included new generator and UPS installations, redundant N+1 system studies, emergency lighting and HVAC upgrades, Client: Bell Canada/Nexacor.

 

 

mcdc

MacDonald Cartier Data Center New Generator, Ottawa, ON (2008):
(Project Completed with WBBP)

Upgrade to emergency power distribution system with installation of 2.0 mW generator and associated equipment in order to increase supply capacity, improve system reliability to provide redundant continuous distribution. Client: PWGSC.